Shutdown Planning

[France] Verantio, in close corporation with Client reliability staff, had setup a MRP (Master Reference Plan) for all tanks within the terminal. The MRP provides the client a 10-20 years look ahead shutdown program which is optimized against the legal requirements, technical integrity, safety requirements, planned activities and commercial/operational limitations. Also peak shaving is included to avoid unwanted volume of storage being not available. The whole methodology is auditable and at request we could include a RBI study if feel needed.